361 Green Safari

361 Green Safari visits the Philip Dennis wind turbine

361 Green Safari visits the 800kW Philip Dennis wind turbine

Thomas and Felix queuing to look inside the turbine tower

Thomas and Felix queuing to look inside the turbine tower

Inside the turbine tower looking up

Inside the turbine tower looking up

Fullabrook wind farm site visit

Fullabrook wind farm site visit

361 Energy on a site visit to Fullabrook wind farm

361 Energy on a site visit to Fullabrook wind farm, the largest in England

Proven 6kW wind turbine on an Exmoor farm

Proven 6kW wind turbine on an Exmoor farm

Learning about a 90kW biomass woodchip boiler on an Exmoor farm

Learning about a 90kW biomass woodchip boiler on an Exmoor farm

Boiler house for the 90kW ETA wood chip boiler

Boiler house for the 90kW ETA wood chip boiler

Demonstration turbine at Glen Lyn Gorge

Demonstration turbine at Glen Lyn Gorge, Lynmouth

Operating 300kW Pelton hydroelectric turbine at Glen Lyn Gorge
Operating 300kW Pelton hydroelectric turbine at Glen Lyn Gorge

Beautiful walk up Glen Lyn Gorge
Beautiful walk up Glen Lyn Gorge

Some distance up the trail was a sign showing the possible future high tide level

Some distance up the trail was a sign showing the possible future high tide level

Share This